Rate chart · Kolkata 2026

The full rate chart

Indicative MSM rates for construction, turnkey interiors, design consultancy and labour — with materials, brands, scope and payment milestones. Final costs are fixed in a signed BOQ after a site visit. GST extra.

Residential building construction · Kolkata 2026

Construction

Building with precision. Creating with purpose.

Material and labour included. Rates are per sq ft of floor-wise covered built-up area for a conventional RCC framed residential building.

Economy

Essential

₹1,800–1,950/ sq ft

Functional residential construction with reliable standard materials and basic finishes.

Recommended

Signature

₹2,150–2,350/ sq ft

Enhanced material specifications, better finishing and branded electrical and plumbing products.

Premium

Luxe

₹2,750–3,200/ sq ft

Premium construction materials, upgraded fittings, better finishes and architectural detailing.

Bespoke

Architect Signature

₹3,500+/ sq ft

Custom-designed residences, premium specifications, specialised materials and bespoke architectural features.

All rates are indicative MSM selling prices, not fixed market tariffs. GST extra. They assume a conventional RCC residential building with a normal foundation; specialist foundations and other exceptional conditions require separate costing.

Material & brand specificationsCement, steel, bricks, fittings, paint and more

Brand names are illustrative approved options. Exact product series, grade, thickness and price allowances are written into the project BOQ before execution.

MaterialEssentialSignatureLuxe
CementUltraTech / ACCUltraTech / AmbujaUltraTech / ACC / Ambuja
TMT steelSAIL / Shyam SteelTata Tiscon / SAILTata Tiscon / approved premium grade
SandApproved river sand / M-sandApproved river sand / M-sandSpecified graded sand
AggregatesStandard approvedGraded approvedGraded approved
BricksFirst-class / fly ashFirst-class / approved AACPremium AAC / approved masonry
FlooringKajaria / OrientbellKajaria / SomanySimpolo / Kajaria premium
Electrical wireFinolex / PolycabPolycab / RR KabelPolycab / RR Kabel
SwitchesAnchor / GMGM / LegrandLegrand / Schneider
Plumbing pipesSupreme / AstralAshirvad / AstralAshirvad / Astral
SanitarywareCERA / EsscoJaquar / CERAKohler / Artize
CP fittingsEssco / CERAJaquarArtize / Grohe
Interior paintAsian Paints Tractor / Berger BisonApcolite / Berger Easy CleanRoyale / Berger Silk
Exterior paintStandard weather coatingAsian Paints Apex / equivalentApex Ultima / premium equivalent
DoorsStandard flush doorsBranded flush doorsPremium engineered / designer doors
WindowsStandard aluminiumBranded aluminium / UPVCPremium UPVC / aluminium systems
Scope of work — what MSM providesFrom site setting-out to handover

Foundation is subject to soil investigation and structural design. Piling, raft foundation, dewatering and unusual excavation are separately assessed unless expressly included in the signed BOQ.

ActivityEssentialSignatureLuxe
Site preparation & setting outIncludedIncludedIncluded
Excavation & earthworkIncludedIncludedIncluded
PCC & foundationIncludedIncludedIncluded
RCC columns, beams & slabsIncludedIncludedIncluded
Reinforcement and shutteringIncludedIncludedIncluded
Brick / block masonryIncludedIncludedIncluded
Internal & external plasteringIncludedIncludedIncluded
Floor and toilet tilingBasicUpgradedPremium
WaterproofingStandard specified systemUpgraded systemPremium specified system
Electrical conduits and wiringIncludedIncludedIncluded
Plumbing and drainageIncludedIncludedIncluded
Basic sanitaryware and CP fittingsIncludedIncludedUpgraded
Doors and windowsStandardUpgradedPremium
Interior and exterior paintingIncludedIncludedIncluded
Staircase and railingStandardUpgradedPremium
Final cleaning and handoverIncludedIncludedIncluded
What is excluded from the construction rateApprovals, interiors, utilities, GST
Excluded workBilling method
Land purchaseExcluded
Architectural consultancy feesSeparate / as agreed
Structural engineering feesSeparate / as agreed
Soil investigation and testingAdditional
KMC / NKDA / other authority approval feesAdditional
Pile foundation, if not in BOQAdditional
Compound wall and main gateSeparate
Lift and elevator installationSeparate
Modular kitchenSeparate interior contract
Wardrobes and fixed furnitureSeparate interior contract
False ceiling and decorative lightingSeparate interior contract
AC and HVAC systemsSeparate quotation
Solar systemsAdditional
Boundary landscapingAdditional
External utility connectionsSeparate
GSTAs applicable
Rate calculation rulesHow we measure and bill
ParticularMSM policy
Rate calculationBuilt-up area
MeasurementFloor-wise covered built-up area
Structural systemRCC framed structure
FoundationAs per approved structural design
Material procurementMSM / approved suppliers
PaymentStage-wise construction milestones
Measurement variationRevised BOQ for approved changes
Material escalationAs per contract escalation clause
ExecutionApproved architectural and structural drawings
Quality controlSite inspections and material checks
Construction milestone paymentsStage-wise, tied to certified progress
  1. 5%Agreement and mobilisation
  2. 10%Foundation and plinth completion
  3. 15%Ground floor RCC structure
  4. 15%Remaining RCC structure
  5. 20%Masonry and plastering
  6. 15%Electrical, plumbing and waterproofing
  7. 10%Flooring, doors, windows and painting
  8. 10%Final handover

Total 100%. Payment releases are tied to certified progress and procurement milestones, not just calendar dates.

Our construction commitment

  • Architect-led planning and project coordination
  • Execution as per approved architectural and structural drawings
  • Quality-assured materials from recognised brands
  • Skilled workforce and systematic site management
  • Technical supervision and workmanship inspections
  • Transparent costing and milestone-based coordination
  • Attention to detail from foundation to handover

Quick estimate

Get a ballpark in seconds

Pick a package and enter your area. An indicative range from the rates above — not a quotation.

Indicative range
—
Send this estimate on WhatsApp

All rates are indicative selling prices for Kolkata, 2026, and are subject to site conditions, final specifications and a signed BOQ. Brand names are illustrative approved options. GST is additional as applicable.

Call WhatsApp